PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed wire to the electrical panel Facing South (800x600).jpg Installing safety cables and poles at Derrick -1 (3rd Floor) Facing South (800x600).jpg Rebar delivery Facing West (800x600).jpg Excavating at Sprinkler room (152A) Facing South  (800x600).jpg Running wire to the Electrical panel for temporary power (800x600).jpg Temporary Lighting at Derrick -1 Facing West (800x600).jpg